Project Details:
A mobile crane was used to lift a large industrial steel structure for loading at the port. The operation involved secure rigging, controlled lifting, and ground coordination to ensure safe handling of the oversized unit. After lifting, the structure was positioned onto a trailer for onward transport to the client’s site.
Project Information
-
Category:
Heavy Cargo Lifting -
Client:
HYDRO -
Location:
Kurasini around port-Dar es Salaam -
Completion Date:
June 2019 -
Project Timeline:
Start: Jun 10, 2019End: Jun 13, 2019Duration: 3 days